Setbacks (Part 2)

Setbacks (Part 2)

Part one here We decided to try the spring powered parachute system one last time before scrapping the idea. We wanted to know if the length of the springs effects the power of the parachute system. The “power” of springs is measured in rate(lb/in). Rate is how much force (in lbs) it takes to compress…

Setbacks

Setbacks

This week we returned to working on the parachute system. With the new receiver, we were able to set up the release servo motors. After some testing, we realized that the servos we originally planned to use did not fit our specifications. Fortunately, we were able to repurpose some other servos we had on hand….

107

107

While we waited for the replacement receiver to arrive we decided to start studying for a 107 license.  A 107 license is needed to operate a sUAS (small Unmanned Aircraft System) or “drone” for commercial purposes.  We are unsure if this license is needed, but as it also allows greater freedom in sUAS operation we…